{"id":31523,"date":"2025-03-03T08:20:02","date_gmt":"2025-03-03T07:20:02","guid":{"rendered":"https:\/\/ggba.swiss\/?p=31523"},"modified":"2025-03-03T08:20:03","modified_gmt":"2025-03-03T07:20:03","slug":"csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries","status":"publish","type":"post","link":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/","title":{"rendered":"CSEM inaugurates Switzerland\u2019s first dry room for next-generation batteries"},"content":{"rendered":"\n<p>Neuch\u00e2tel\u2019s technology center <a href=\"https:\/\/www.csem.ch\/en\/\">CSEM<\/a> has announced the launch of Switzerland\u2019s first dry room, an advanced facility aimed at fast-tracking the development of next-generation battery technologies. As part of its Battery Innovation Hub (BIH), this 37-square-meter infrastructure is set to become operational in September 2025 and will serve as a key enabler for industrializing high-energy-density batteries.<\/p>\n\n\n\n<p>The dry room features an ultra-low dew point of \u221250\u00b0C, providing an optimal environment for handling moisture-sensitive materials such as lithium metal, which is crucial for the development of solid-state batteries. The facility also includes a pilot production line for assembling pouch cells, the battery type commonly used in electric vehicles and consumer electronics.<\/p>\n\n\n\n<p>Andrea Ingenito, Co-Director of the Battery Innovation Hub, emphasized the strategic importance of the facility: \u201cCSEM\u2019s dry room isn\u2019t just a technical upgrade\u2014it\u2019s a key enabler for proving the industrial viability of the technologies developed within our Battery Innovation Hub.\u201d<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Solid-state batteries: A Swiss-led revolution?<\/h4>\n\n\n\n<p>Beyond research, CSEM has dedicated a 10-square-meter section of the dry room to start-ups and SMEs, offering them access to cutting-edge equipment and expertise. This initiative is designed to help smaller companies reduce risks and costs associated with battery innovation, enabling them to scale up faster and advance to higher technology readiness levels.<\/p>\n\n\n\n<p>Solid-state lithium-metal batteries are seen as the future of energy storage, promising higher energy density, faster charging times, and improved safety. However, manufacturing challenges remain a barrier to large-scale production. CSEM\u2019s new dry room will play a pivotal role in developing scalable processes to bring these batteries closer to mass production.<\/p>\n\n\n\n<p>\u201cNew materials and manufacturing techniques present a unique opportunity to rebuild Europe\u2019s battery industry,\u201d noted Ingenito. \u201cSwitzerland must act now to stay ahead in this strategic market.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CSEM has unveiled Switzerland\u2019s first-ever dry room, a state-of-the-art facility designed to accelerate the commercialization of next-generation batteries.<\/p>\n","protected":false},"author":6,"featured_media":31524,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"mc4wp_mailchimp_campaign":[],"footnotes":""},"categories":[839],"tags":[936,1011,909,886,899],"class_list":["post-31523","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tech-en","tag-energy","tag-infrastructures","tag-micronano-technology","tag-rd","tag-sustainability"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CSEM inaugurates its first dry room for next-generation batteries<\/title>\n<meta name=\"description\" content=\"CSEM has unveiled Switzerland\u2019s first-ever dry room, a facility designed to accelerate the commercialization of next-generation batteries.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CSEM inaugurates its first dry room for next-generation batteries\" \/>\n<meta property=\"og:description\" content=\"CSEM has unveiled Switzerland\u2019s first-ever dry room, a facility designed to accelerate the commercialization of next-generation batteries.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\" \/>\n<meta property=\"og:site_name\" content=\"Greater Geneva Bern area\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-03T07:20:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-03T07:20:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1180\" \/>\n\t<meta property=\"og:image:height\" content=\"811\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Pierre-Yves Oehrli\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pierre-Yves Oehrli\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\"},\"author\":{\"name\":\"Pierre-Yves Oehrli\",\"@id\":\"https:\/\/staging.ggba.swiss\/en\/#\/schema\/person\/0b2e6d04131e3d01237dcb741fa33d41\"},\"headline\":\"CSEM inaugurates Switzerland\u2019s first dry room for next-generation batteries\",\"datePublished\":\"2025-03-03T07:20:02+00:00\",\"dateModified\":\"2025-03-03T07:20:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\"},\"wordCount\":303,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg\",\"keywords\":[\"Energy\",\"Infrastructures\",\"Micro\/Nano Technology\",\"R&amp;D\",\"Sustainability\"],\"articleSection\":[\"Tech\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\",\"url\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\",\"name\":\"CSEM inaugurates its first dry room for next-generation batteries\",\"isPartOf\":{\"@id\":\"https:\/\/staging.ggba.swiss\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg\",\"datePublished\":\"2025-03-03T07:20:02+00:00\",\"dateModified\":\"2025-03-03T07:20:03+00:00\",\"author\":{\"@id\":\"https:\/\/staging.ggba.swiss\/en\/#\/schema\/person\/0b2e6d04131e3d01237dcb741fa33d41\"},\"description\":\"CSEM has unveiled Switzerland\u2019s first-ever dry room, a facility designed to accelerate the commercialization of next-generation batteries.\",\"breadcrumb\":{\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage\",\"url\":\"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg\",\"contentUrl\":\"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg\",\"width\":1180,\"height\":811,\"caption\":\"CSEM\u2019s dry room enables cutting-edge battery innovation by providing an ultra-low humidity environment for handling lithium metal and other sensitive materials. | \u00a9 Christian Beutler\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ggba.swiss\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CSEM inaugurates Switzerland\u2019s first dry room for next-generation batteries\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/staging.ggba.swiss\/en\/#website\",\"url\":\"https:\/\/staging.ggba.swiss\/en\/\",\"name\":\"Greater Geneva Bern area\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/staging.ggba.swiss\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/staging.ggba.swiss\/en\/#\/schema\/person\/0b2e6d04131e3d01237dcb741fa33d41\",\"name\":\"Pierre-Yves Oehrli\",\"url\":\"https:\/\/ggba.swiss\/en\/author\/pierre-yves-oehrli\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CSEM inaugurates its first dry room for next-generation batteries","description":"CSEM has unveiled Switzerland\u2019s first-ever dry room, a facility designed to accelerate the commercialization of next-generation batteries.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/","og_locale":"en_US","og_type":"article","og_title":"CSEM inaugurates its first dry room for next-generation batteries","og_description":"CSEM has unveiled Switzerland\u2019s first-ever dry room, a facility designed to accelerate the commercialization of next-generation batteries.","og_url":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/","og_site_name":"Greater Geneva Bern area","article_published_time":"2025-03-03T07:20:02+00:00","article_modified_time":"2025-03-03T07:20:03+00:00","og_image":[{"width":1180,"height":811,"url":"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg","type":"image\/jpeg"}],"author":"Pierre-Yves Oehrli","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Pierre-Yves Oehrli","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#article","isPartOf":{"@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/"},"author":{"name":"Pierre-Yves Oehrli","@id":"https:\/\/staging.ggba.swiss\/en\/#\/schema\/person\/0b2e6d04131e3d01237dcb741fa33d41"},"headline":"CSEM inaugurates Switzerland\u2019s first dry room for next-generation batteries","datePublished":"2025-03-03T07:20:02+00:00","dateModified":"2025-03-03T07:20:03+00:00","mainEntityOfPage":{"@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/"},"wordCount":303,"commentCount":0,"image":{"@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage"},"thumbnailUrl":"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg","keywords":["Energy","Infrastructures","Micro\/Nano Technology","R&amp;D","Sustainability"],"articleSection":["Tech"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/","url":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/","name":"CSEM inaugurates its first dry room for next-generation batteries","isPartOf":{"@id":"https:\/\/staging.ggba.swiss\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage"},"image":{"@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage"},"thumbnailUrl":"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg","datePublished":"2025-03-03T07:20:02+00:00","dateModified":"2025-03-03T07:20:03+00:00","author":{"@id":"https:\/\/staging.ggba.swiss\/en\/#\/schema\/person\/0b2e6d04131e3d01237dcb741fa33d41"},"description":"CSEM has unveiled Switzerland\u2019s first-ever dry room, a facility designed to accelerate the commercialization of next-generation batteries.","breadcrumb":{"@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#primaryimage","url":"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg","contentUrl":"https:\/\/ggba.swiss\/app\/uploads\/2025\/03\/CSEM-Dry-Room-1180x811-1.jpeg","width":1180,"height":811,"caption":"CSEM\u2019s dry room enables cutting-edge battery innovation by providing an ultra-low humidity environment for handling lithium metal and other sensitive materials. | \u00a9 Christian Beutler"},{"@type":"BreadcrumbList","@id":"https:\/\/ggba.swiss\/en\/csem-inaugurates-switzerlands-first-dry-room-for-next-generation-batteries\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ggba.swiss\/en\/"},{"@type":"ListItem","position":2,"name":"CSEM inaugurates Switzerland\u2019s first dry room for next-generation batteries"}]},{"@type":"WebSite","@id":"https:\/\/staging.ggba.swiss\/en\/#website","url":"https:\/\/staging.ggba.swiss\/en\/","name":"Greater Geneva Bern area","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/staging.ggba.swiss\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/staging.ggba.swiss\/en\/#\/schema\/person\/0b2e6d04131e3d01237dcb741fa33d41","name":"Pierre-Yves Oehrli","url":"https:\/\/ggba.swiss\/en\/author\/pierre-yves-oehrli\/"}]}},"_links":{"self":[{"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/posts\/31523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/comments?post=31523"}],"version-history":[{"count":1,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/posts\/31523\/revisions"}],"predecessor-version":[{"id":31527,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/posts\/31523\/revisions\/31527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/media\/31524"}],"wp:attachment":[{"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/media?parent=31523"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/categories?post=31523"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ggba.swiss\/en\/wp-json\/wp\/v2\/tags?post=31523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}